Home/ Services
Services

Five ways to put your brand on a light therapy device.

Whether you need a housing changed, a wavelength added, an app built or a full device developed from a sketch, the route starts in the same place: a feasibility note from an engineer.

MOQ from 100 pcs Sampling in 48h Tooling 25–35 days NDA on request
Service 01

OEM / ODM Development

Two starting points, one outcome: a device that is yours.

OEM — you bring the industrial design, the dose targets and the market. We engineer the internals, prove the optics, build the tooling and take it through certification.

ODM — you start from one of our validated platforms and change the housing, wavelength mix, firmware and packaging. Faster and materially cheaper, because the expensive validation already happened.

Discuss your project
CompareOEMODM
Starting pointYour designOur platform
ToolingNew, 25–35 daysPartial or none
ValidationFull, from zeroReused + delta testing
MOQ500–1,000 pcs100–300 pcs
Timeline4–6 months6–10 weeks
Service 02

Private Label

The shortest route to market: an existing model, your logo, your packaging, your manual.

We keep stock shells for the catalogue platforms, so private label does not wait for a tooling cycle. Branding covers laser marking or silk-screen on the housing, colour-matched silicone, a printed manual in your language and retail packaging designed to your dieline.

  • Logo on housing, carry case and packaging
  • Manual and insert localisation
  • Custom retail box and inner tray
  • Serial numbering and batch records
7–10

days for branded stock units

100

pcs minimum per model

0

tooling cost on stock shells

12

months warranty, extendable

Service 03

Wholesale & Distribution

For distributors, clinics and retailers buying unbranded or lightly branded stock.

Catalogue models ship from Shenzhen with your choice of plug standard, language and packaging. Volume tiers start at 100 pieces, and mixed pallets are accepted so a distributor can test several SKUs without committing to a full container of one.

  • Mixed-SKU pallets from 100 pcs total
  • Neutral or branded packaging
  • EXW / FOB / DDP terms
  • Spare parts and DOA replacement pool
Typical tier structure
100–299 pcsList price −12%
300–999 pcsList price −22%
1,000+ pcsQuoted per programme

Indicative only — final pricing depends on model, configuration and shipping terms.

Service 04

Customization that changes the product, not just the sticker

Four layers, in increasing order of engineering effort. Most brands start at layer two.

01

Cosmetic

Colour, finish, logo, packaging. No new tooling, no re-validation.

02

Optical

Wavelength mix, LED layout, irradiance targets. Delta testing required.

03

Structural

Housing ergonomics, wearable fit, mounting. New tooling, partial re-test.

04

System

Firmware, app, connectivity, protocols. Full verification cycle.

Service 05

APP Customization

A device without software is a device without data — and without a reason to open it twice.

Our firmware team builds BLE and Wi-Fi modules into the device, then delivers an app shell carrying your brand: session scheduling, dose history, reminders and firmware updates over the air. White-label builds ship in 6–8 weeks; deeper integrations take longer.

  • iOS and Android from one codebase
  • Brand-owned UI, not a shared white-label skin
  • Dose and adherence data export
  • OTA firmware updates
Session
20:00

Red 633 nm · 42 mW/cm² · face

12:24 elapsed7:36 left
This week5 / 7 sessions
Total dose148 J/cm²
Next reminderToday 20:00
Before You Ask

Questions we get on the first call

If yours is not here, it is probably the right question to send us.

Ask an Engineer
What is the real minimum order?

100 pcs on stock private-label shells, 300 pcs where a colour or silicone change is involved, 500–1,000 pcs when new tooling is needed. Sampling is one to three units at sample cost, refunded against the first production order.

Can you certify for my market, or do I have to?

We run pre-compliance testing in-house and prepare the technical file. Final certification is issued by the notified body or lab in your market — we coordinate it and supply every document they ask for, but the certificate is held by the brand or its authorised representative.

How long does a full OEM project take?

Four to six months from brief to first shipment: 3–4 weeks concept and simulation, 4–6 weeks prototyping and bench testing, 25–35 days tooling, then certification and a pilot run. ODM adaptations run 6–10 weeks.

Do you sign an NDA?

Yes — yours or ours, before drawings are exchanged. We also keep a project code instead of your brand name on internal documents if that matters to you.

What happens if units fail in the field?

Standard terms are a 1–2% DOA replacement pool shipped with each order, a 12-month warranty on electronics, and spare LED boards and drivers available for the life of the model.

Start Here

Send the brief. Get a feasibility note, not a brochure.

Tell us the form factor, the wavelengths and the market. We reply with what is reusable, what needs tooling, and what it costs.